“Here’s a cold, hard fact that no one can dispute,” says Bob Hinz, owner and president of HomeWrights. “Nobody knows what your home will cost until the last brush stroke is done or the last window is washed.” Custom means exactly that: never been built before, the first one of its kind.
That doesn’t make the budget a guess. Bob says a new custom home budget should carry about 200 line items, and the more you break it down, the clearer it gets. A smart buyer reads every one of those lines and asks a single question: “Do the dollars match the dream?” It’s harder work up front, Bob admits, but it makes the back side of the project so much easier.
Run the common sense test
Those line items roll up into big buckets: soft costs, foundation, framing, roof, windows, mechanical systems, finishes, and so on. When the products are the same, each bucket should cost about the same no matter who builds it.
So if one builder prices framing at $150K and another at $120K, Bob says they aren’t building the same thing. One is cutting corners, or one is padding in a big safety margin. Apply the common sense test to every line, or at least to the big buckets. “A price that seems too good to be true usually is!”
Bob’s advice on the shell is simple: nobody ever regrets spending more on better heating and cooling or better insulation, even if it means giving up some cosmetic upgrades. Finishes are where the totals really move. Bob compared two real clients, each building about 5,000 square feet. One spent $240,000 on cabinetry and appliances, the other $60,000. One spent $50,000 on solid walnut interior doors, the other $7,500 on paint grade doors in the same design. One spent $75,000 on plumbing fixtures and bath hardware, the other $16,000.
“These numbers are real!” Bob says. That’s why a builder promising a finished home for $1,000,000 can’t be offering the same product as one promising it for $1,250,000.
Costs that surprise people before you build
Soft costs are everything that doesn’t get nailed down: surveying, testing, engineering, architecture, energy design, permits, and insurance. Bob says people are always surprised by how fast these small-seeming items add up, often to $50K or more. Permit and water tap fees tend to be the biggest shock.
Then there’s use tax. Many Colorado cities and counties, including Boulder, Fort Collins, and Broomfield, collect it on construction materials when the building permit is issued. In other words, you’re paying sales tax on the parts of your home before you’ve bought them. Bob calls it a city’s way of collecting its pound of flesh on the front end. The upside is that suppliers shouldn’t charge local sales tax on those materials later.
Slopes make foundations cost more, Bob says, and some slopes force foundation walls to 12 or 14 feet tall. Soils that are too soft, too hard, too wet, or too expansive add engineering, and so does building 5 feet from the property line instead of 15. He has seen a $50K difference in foundation costs, plus another $25K in excavation and backfill, between two homes that look almost identical on paper.
Where the money quietly goes
If you take away one thing, Bob says, make it this: “No matter who builds the house, if the components and finishes are the same, the cost of materials and labor will be the same!” Outside the giant production builders, nobody buys materials at amazing discounts. The differences live in profit and markup.
Markups aren’t nefarious. That’s how this business works. The trick is seeing how they stack. A builder might quote a fee of 12%, which sounds reasonable. Read the budget closely, though, and you may find separate lines for general and administrative expense, site supervision, and material markup. Add them up, Bob says, and you’re likely in the 20 to 30% range, with change order fees on top of that.
At HomeWrights, it works differently. For Owner-Builders using the HomeWrights Method, the fee is based on square footage and locked once plans are complete. “We do not adjust it. Period!” Bob says. If an owner-builder chooses $240,000 cabinets, it doesn’t make HomeWrights’ work harder or easier, so the fee stays put. For Turnkey clients, the fee is a percentage of project cost, since a high-end package really is more work to manage.
Either way, the owner sees the actual invoice or bid for every single item. That means well informed decisions on every stick and brick, and no mystery about how a change affects the fee.
Before you sign, plan for overruns and time
HomeWrights doesn’t tuck a contingency line into its estimates. Instead, Bob tells clients plainly to expect an overrun of at least 10% on new construction and about 20% on a large addition or remodel. Lenders add their own contingency on top.
Time is the cost people overlook. Loan interest is charged on what’s been drawn, so it’s heaviest in the final months, and Bob says the urgency you bring in month one decides what money costs you at the end. One client spent weeks on appliance decisions to save $5,000, then paid more than that in extra interest. Another saved about $15,000 on European windows, until a 12-week shipping forecast turned into 16. “The savings disappeared.”
Bob’s bottom line: if you’re about to spend $1 million or more, a side-by-side comparison of two estimates, with every line item explained, should be the minimum standard. It sounds simplistic, but cost is cost, and it’s the same no matter who builds the home. With HomeWrights, you know the exact cost, and the fees are never a surprise.
Want to see what a line-by-line budget looks like for your build? Whether you’re leaning toward the HomeWrights Method or Turnkey, call us at 303-756-8870 or reach out through our Contact page to start the conversation.
Ready to start your Colorado build?
At HomeWrights Custom Homes, we’ve helped hundreds of Colorado families take control of their custom builds—whether as Owner-Builders managing their own projects or through our Turnkey Program with full transparency.
No matter which path you choose, you’ll have open books, experienced guidance, and a proven process that puts you firmly in the driver’s seat.
Let’s build smarter together.
Call 303-756-8870 or Contact Us
to start your Colorado custom home journey today.